The following is a list of the projects developed by Constructora
ICON:
PROJECT: One Jaco Resort and Beach Club
OWNER: Desarrollos Naturales de Costa Rica
CONSTRUCTION AREA: 30,000 m2
DEADLINE AND YEAR OF EXECUTION: 14 months, October 2008.
LOCATION: Jacó, Garabito de Puntarenas
CONSULTANTS: EEB Ingeniería, Aplitec Ingeniería, Consultora del Este
OBSERVATIONS: Construction of: Foundations, Pedestales, Contrapisos y Losas de Entrepiso del Proyecto One Jaco Resort Fase I
PROJECT: Hotel RIU
OWNER: RIU Hotel and Resorts
CONSTRUCTION AREA: 25,000 m2
DEADLINE AND YEAR OF EXECUTION: 18 months (2008)
LOCATION: Playa Matapalo, Guanacaste
CONSULTANTS: Ingenya Consultores
PROJECT: Veragua Rain Forest
OWNER: Jungla de Aventura del Atlántico S.A.
CONSTRUCTION AREA: 5,000 m2
DEADLINE AND YEAR OF EXECUTION: 1 year and 10 months (2008)
LOCATION: Liverpool, Limón
CONSULTANTS: Acuña Lett Arquitectos, Luis Rojas y Asociado, Circuito S.A.
PROJECT: Hipermás
OWNER: CORPORACION DE SUPERMERCADOS UNIDOS S.A.
CONSTRUCTION AREA: 11 000 m2
DEADLINE AND YEAR OF EXECUTION: 16 weeks, 2007
LOCATION: Escazú, San José.
CONSULTANTS: Ossenbach, Pendones y Bonilla Arquitectos S.A.
OBSERVAATIONS: Obra Civil Complementaria y Acabados.
PROJECT: Refuerzo Estructural Chimenea Horno 200, VICESA
OWNER: Vidriera Centroamericana S.A.
CONSTRUCTION AREA: 290 m2 de Reforzamiento
DEADLINE AND YEAR OF EXECUTION: 100 Days (2008)
LOCATION: Coris de Cartago
CONSULTANTS: Grupo Integra S.A.
PROJECT: Diseño/construcción de Planta de Tratamiento, SARDIMAR
OWNER: Sardimar
YEAR OF EXECUTION: 2008
LOCATION: Barranca, Puntarenas
CONSULTANTS: Grupo IECA
PROJECT: Planta Boston Scientific, Coyol. (Cimentaciones, mezzanines y otras obras, Etapa II)
OWNER: Boston Scientific Corporation, Costa Rica
CONSTRUCTION AREA: 34,000 m2
DEADLINE AND YEAR OF EXECUTION: 7 months (2008)
LOCATION: El coyol de Alajuela
CONSULTANTS: OPB, EICA, Wesslin Architects, Vanderweil Engineers, Inc., Circuito S.A.,Boston Industrial Consulting.
PROJECT: Cimentaciones para equipo, Planta El Coyol
OWNER: Praxair Costa Rica S.A.
DEADLINE AND YEAR OF EXECUTION: 3 months (2008)
LOCATION: El coyol de Alajuela
CONSULTANTS: Ing. Pio Miranda
PROJECT: Bodegas TUBOTICO
OWNER: Tubotico S.A.
CONSTRUCTION AREA: 4,600 m2
DEADLINE AND YEAR OF EXECUTION: 16 semanas(2006)
LOCATION: Caldera, Puntarenas
PROJECT: Centro de Acopio, Empaque y Clasificación de Frijoles.
OWNER: Kani Mil novecientos uno S.A.
CONSTRUCTION AREA: 1,500 m2
DEADLINE AND YEAR OF EXECUTION: 24 semanas(2006)
UBICACIÓN: El Alto de Ochomogo
LOCATION: Icicor
PROJECT: Almacén Agroveterinario Dos Pinos
OWNER: Cooprole R.L.
CONSTRUCTION AREA: 1,700 m2
DEADLINE AND YEAR OF EXECUTION: 20 semanas(2006)
UBICACIÓN: Barrio Luján, San José.
LOCATION: Arq. Alejandro Gómez
PROJECT: Ferretería EPA (Obras civiles complementarias, acabados y oficinas)
OWNER: EPA
CONSTRUCTION AREA: 5,600 m2
DEADLINE AND YEAR OF EXECUTION: 12 semanas (2006)
UBICACIÓN: Escazú, San José
LOCATION: Serproco/Integra
PROJECT: Ampliación Tienda Pequeño Mundo
OWNER: Universal Securities S.A.
CONSTRUCTION AREA: 1,500 m2
DEADLINE AND YEAR OF EXECUTION: 12 semanas(2005)
LOCATION: Guachipelín, Escazú
PROJECT: Pequeño Mundo Store San Pedro
OWNER: Universal Securities S.A.
CONSTRUCTION AREA: 2,700 m2
DEADLINE AND YEAR OF EXECUTION: In progress (2005)
LOCATION: San Pedro, Montes de Oca
PROJECT: Fiscalización KANI
OWNER: Kani Mil novecientos uno S.A.
CONSTRUCTION AREA: 3,000.00 m2
DEADLINE AND YEAR OF EXECUTION: (2005)
LOCATION: El Alto de Ochomogo
CONSULTANTS: Icicor
PROJECT: Office Depot La Uruca
OWNER: Office Depot
CONSTRUCTION AREA: 1,785 m2
DEADLINE AND YEAR OF EXECUTION: 14 weeks (2005)
LOCATION: La Uruca, San José
CONSULTANTS: Grupo Integra
PROJECT: Ferretería EPA (Closure walls and finishings)
OWNER: EPA
CONSTRUCTION AREA: 4,500 m2
DEADLINE AND YEAR OF EXECUTION: 14 weeks (2005)
LOCATION: Curridabat, San José
CONSULTANTS: Serproco/Integra
PROJECT: Office Depot Mall Paseo de las Flores (Finishings)
OWNER: Office Depot
CONSTRUCTION AREA: 1,600 m2
DEADLINE AND YEAR OF EXECUTION: 4 weeks (2004)
LOCATION: Heredia
CONSULTANTS: Grupo Integra
PROJECT: Training classrooms and other improvements
OWNER: Cooperativa Dos Pinos
DEADLINE AND YEAR OF EXECUTION: 4 months (2004)
LOCATION: Rió Segundo, Alajuela
CONSULTANTS: Cooperativa Dos Pinos
PROJECT: Office Center
OWNER: Lic. Katia Rojas
CONSTRUCTION AREA: 200 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (2004)
LOCATION: Santa Ana
CONSULTANTS: Grupo ILAA
PROJECT: Pequeño Mundo Store Desamparados
OWNER: Universal Securities S.A.
CONSTRUCTION AREA: 3,000 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (2004)
LOCATION: Desamparados
PROJECT: Finishings Plaza Universitaria
OWNER: Plaza Universitaria S.A.
CONSTRUCTION AREA: 4,500 m2
DEADLINE AND YEAR OF EXECUTION: 3 months (2004)
LOCATION: San Pedro, Montes de Oca
CONSULTANTS: Arch. Vito DiPipa
PROJECT: Remodeling of Ríos Tropicales
OWNER: Ríos Tropicales S.A.
CONSTRUCTION AREA: 465 m2
DEADLINE AND YEAR OF EXECUTION: 2 months (2004)
LOCATION: San José
PROJECT: Design-Construction Sewage Water Treatment Plant
OWNER: Cooperativa Dos Pinos
DEADLINE AND YEAR OF EXECUTION: 4 months (2004)
LOCATION: San Carlos
CONSULTANTS: IECA
PROJECT: Remodeling of residence
OWNER: Mr. Oswaldo Álvarez
DEADLINE AND YEAR OF EXECUTION: 2 months (2004)
LOCATION: Pavas
CONSULTANTS: Ingenya
PROJECT: Residence
OWNER: Dr. Avelino Hernández
CONSTRUCTION AREA: 310 m2
DEADLINE AND YEAR OF EXECUTION: 8 months (2003)
LOCATION: Rió Oro, Santa Ana
CONSULTANTS: Ingenya
PROJECT: Rent a Car (Budget, Alamo, Toyota, National)
OWNER: Arrendadora Cafsa
CONSTRUCTION AREA: 1,600 m2
DEADLINE AND YEAR OF EXECUTION: 22 weeks (2003)
LOCATION: Liberia, Guanacaste
CONSULTANTS: Katia Martén Arquitectos
PROJECT: Residence
OWNER: Mr. James Tracy
CONSTRUCTION AREA: 500 m2
DEADLINE AND YEAR OF EXECUTION: 10 months (2003)
LOCATION: Residencial El Monasterio, Escazú
CONSULTANTS: Katia Martén Arquitectos
PROJECT: Remodeling of Budget Rent a Car
OWNER: Budget Rent a Car
DEADLINE AND YEAR OF EXECUTION: 1 month (2003)
LOCATION: Rió Segundo de Alajuela
PROJECT: Cerámica Florentina Factory (Ceramic Tiles Factory)
OWNER: Sicorsa
CONSTRUCTION AREA: 6,500 m2
DEADLINE AND YEAR OF EXECUTION: 10 months (2003)
LOCATION: Coris de Cartago
CONSULTANTS: Grupo Integra
PROJECT: Office Depot San Pedro
OWNER: Office Depot
CONSTRUCTION AREA: 1,720 m2
DEADLINE AND YEAR OF EXECUTION: 14 weeks (2002)
LOCATION: San Pedro
CONSULTANTS: Grupo Integra
PROJECT: Office Depot Escazú
OWNER: Office Depot
CONSTRUCTION AREA: 2,140 m2
DEADLINE AND YEAR OF EXECUTION: 20 weeks (2002)
LOCATION: Escazú
CONSULTANTS: Grupo Integra
PROJECT: Refrigeration Chamber
OWNER: Fresas del Trópico
DEADLINE AND YEAR OF EXECUTION: 2 months (2002)
LOCATION: Heredia
PROJECT: Office Remodeling
OWNER: Arrendadora CAFSA
CONSTRUCTION AREA: 465 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (2002)
LOCATION: San José
CONSULTANTS: Katia Martén Arquitectos
PROJECT: Pequeño Mundo Store Escazú
OWNER: Universal Securities S.A.
CONSTRUCTION AREA: 2,160 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (2001)
LOCATION: Guachipelín, Escazú
PROJECT: Refrigeration Chambers
OWNER: CENADA
DEADLINE AND YEAR OF EXECUTION: 2 months (2001)
LOCATION: San Antonio de Belén, Heredia
PROJECT: Residence
OWNER: Mr. Carlos Jiménez
CONSTRUCTION AREA: 450 m2
DEADLINE AND YEAR OF EXECUTION: 9 months (2001)
LOCATION: San Rafael, Alajuela
CONSULTANTS: Katia Martén Arquitectos
PROJECT: Condominiums María Luisa
OWNER: Eng. Rodolfo Castro
CONSTRUCTION AREA: 1,200 m2
DEADLINE AND YEAR OF EXECUTION: 11 months (2001)
LOCATION: Curridabat
CONSULTANTS: Eng. Rodolfo Castro/Arch. Manuel Trejos
PROJECT: Refrigeration Chambers
OWNER: PIPASA
DEADLINE AND YEAR OF EXECUTION: (2001)
LOCATION: La Guácima, Alajuela
PROJECT: Residence
OWNER: Mr. Richard Leonard
CONSTRUCTION AREA: 750 m2
DEADLINE AND YEAR OF EXECUTION: 11 months (2001)
LOCATION: Tango Mar, Guanacaste
CONSULTANTS: Arch. Edgar Brenes
PROJECT: Parking lot and Refrigeration Chambers
OWNER: Cinta Azul S.A.
CONSTRUCTION AREA: 2,100 m2
DEADLINE AND YEAR OF EXECUTION: (2000)
LOCATION: La Guácima, Alajuela
PROJECT: Cadet School
OWNER: Salvation Army
CONSTRUCTION AREA: 2,100 m2
DEADLINE AND YEAR OF EXECUTION: 11 months (2000)
LOCATION: San Isidro de Heredia
CONSULTANTS: Ingenya
PROJECT: Residence
OWNER: Mrs. Roxana Jiménez
CONSTRUCTION AREA: 315 m2
DEADLINE AND YEAR OF EXECUTION: 8 months (2000)
LOCATION: Los Yoses, San Pedro
CONSULTANTS: Katia Martén Arquitectos
PROJECT: Residence
OWNER: Lic. Katia Rojas
CONSTRUCTION AREA: 220 m2
DEADLINE AND YEAR OF EXECUTION: 8 months (2000)
LOCATION: Brasil de Mora, San José
CONSULTANTS: Arch. Peter Vancelow
PROJECT: Remodeling Residence
OWNER: Mr. Luis González Magán
DEADLINE AND YEAR OF EXECUTION: 2 months (2000)
LOCATION: Coronado
PROJECT: Sewage Water Treatment Plant
OWNER: Cinta Azul S.A.
DEADLINE AND YEAR OF EXECUTION: 4 months (2000)
LOCATION: La Guácima, Alajuela
CONSULTANTS: Consortium Stork Aqua (Holanda) / Icon
PROJECT: Universidad de las Ciencias y las Artes
OWNER: Mrs. Ana Mata Trejos
CONSTRUCTION AREA: 1,120 m2
DEADLINE AND YEAR OF EXECUTION: 10 months (2000)
LOCATION: Barrio Luján, San José
CONSULTANTS: Eng. Carlos Sandoval
PROJECT: Restructuring of Industrial Plant
OWNER: Cinta Azul S.A.
CONSTRUCTION AREA: 2,100 m2
DEADLINE AND YEAR OF EXECUTION: 11 months (2000)
LOCATION: La Guácima de Alajuela
CONSULTANTS: Ingenya
PROJECT: Training Classroom
OWNER: Cinta Azul S.A.
DEADLINE AND YEAR OF EXECUTION: 1 month (1999)
LOCATION: La Guácima de Alajuela
PROJECT: Maintenance of Pilar Jiménez and Abraham Lincoln School
OWNER: MOPT
DEADLINE AND YEAR OF EXECUTION: 1 month (1999)
LOCATION: San José
CONSULTANTS: MOPT
PROJECT: External Sales Module
OWNER: Cinta Azul S.A.
CONSTRUCTION AREA: 120 m2
DEADLINE AND YEAR OF EXECUTION: 2 months (1999)
LOCATION: La Guácima de Alajuela
PROJECT: Access Ramp and pipe path
OWNER: Bananera El Prado S.A.
DEADLINE AND YEAR OF EXECUTION: 1 month (1998)
LOCATION: San Antonio de Belén
PROJECT: Hazardous Waste Storage
OWNER: Intel
CONSTRUCTION AREA: 120 m2
DEADLINE AND YEAR OF EXECUTION: 3 months (1998)
LOCATION: San Antonio de Belén
CONSULTANTS: Intel
PROJECT: Security Booths and automatic entry systems
OWNER: Intel
DEADLINE AND YEAR OF EXECUTION: 2 months (1998)
LOCATION: San Antonio de Belén
CONSULTANTS: Intel
PROJECT: Demolition IV Floor, Library Carlos Monge Alfaro
OWNER: UCR (University of Costa Rica)
CONSTRUCTION AREA: 1,800 m2
DEADLINE AND YEAR OF EXECUTION: 3 months (1998)
LOCATION: San Pedro, School of Humanities
CONSULTANTS: UCR (University of Costa Rica)
PROJECT: Universidad de Iberoamérica
OWNER: UNIBE
CONSTRUCTION AREA: 450 m2
DEADLINE AND YEAR OF EXECUTION: 5 months (1998)
LOCATION: Tibás
CONSULTANTS: Arch. Franz Beer
PROJECT: Restructuring of Gymnasium
OWNER: UCR
CONSTRUCTION AREA: 2,000 m2
DEADLINE AND YEAR OF EXECUTION: 2 months (1997)
LOCATION: Sabanilla, Sports Facilities
CONSULTANTS: UCR (University of Costa Rica)
PROJECT: Pretreatment of sewage waters and floor slabs
OWNER: DEMASA
DEADLINE AND YEAR OF EXECUTION: 3 months (1997)
LOCATION: Heredia
CONSULTANTS: Ingeniería Sismo Resistente (ISR)
PROJECT: Beach House
OWNER: Lic. Mario Montealegre
CONSTRUCTION AREA: 90 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (1997)
LOCATION: Playa Coyote, Guanacaste
CONSULTANTS: Arch. Alejandro Gómez
PROJECT: Warehouse
OWNER: ITR
CONSTRUCTION AREA: 400 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (1997)
LOCATION: San José
CONSULTANTS: Eng. Mario León Páez
PROJECT: Professional Tennis Court
OWNER: Mr. Carlos Bravo
DEADLINE AND YEAR OF EXECUTION: 2 months (1997)
LOCATION: Sarchí, Costa Rica
PROJECT: Concrete slabs for loading and unloading yard
OWNER: INPROSA
DEADLINE AND YEAR OF EXECUTION: 1 month (1996)
LOCATION: San José
PROJECT: Universidad Iberoamericana
Remodeling Annex
OWNER: UNIBE
DEADLINE AND YEAR OF EXECUTION: 3 months (1996)
LOCATION: San José
CONSULTANTS: Arch. Franz Beer
PROJECT: Expansion of the railroad loading area
OWNER: Recope
DEADLINE AND YEAR OF EXECUTION: 2 months (1996)
LOCATION: El Alto de Ochomogo
CONSULTANTS: Recope
PROJECT: Retaining walls, Urbanización Río Agres
OWNER: Río Agres S.A.
DEADLINE AND YEAR OF EXECUTION: 4 months (1996)
LOCATION: Escazú
CONSULTANTS: PIASA
PROJECT: Residence
OWNER: Mr. Luis Ángel González Magán
CONSTRUCTION AREA: 120 m2
DEADLINE AND YEAR OF EXECUTION: 4 months (1996)
LOCATION: Coronado
CONSULTANTS: Arch. Alejandro Gómez
PROJECT: Base for silos
OWNER: Cooperativa Dos Pinos
DEADLINE AND YEAR OF EXECUTION: 2 months (1995)
LOCATION: San Carlos
CONSULTANTS: Cooperativa Dos Pinos
PROJECT: Office Remodelling
OWNER: Cámara Costarricense de la Industria Alimentaria (CACIA)
(Costa Rican Chamber of Food Industry)
DEADLINE AND YEAR OF EXECUTION: 3 months (1995)
LOCATION: San José
PROJECT: Office Remodeling
OWNER: Cooperativa Dos Pinos
CONSTRUCTION AREA: 90 m2
DEADLINE AND YEAR OF EXECUTION: 3 months (1995)
LOCATION: Barrio Luján
CONSULTANTS: Cooperativa Dos Pinos
PROJECT: Residence
OWNER: Mr. Oswaldo Álvarez
CONSTRUCTION AREA: 180 m2
DEADLINE AND YEAR OF EXECUTION: 8 months (1994)
LOCATION: San José
CONSULTANTS: Arch. Jorge Muñoz Gavayet
PROJECT: Apartments
OWNER: Sr. Fernando Vindas Camacho
CONSTRUCTION AREA: 280 m2
DEADLINE AND YEAR OF EXECUTION: 11 months (1994)
LOCATION: Heredia
CONSULTANTS: Design-Construction: Constructora Icon
PROJECT: Naves Industriales Zona Franca BES (Industrial Bays -Free
Zone BES)
OWNER: Corporación de Inversión y Desarrollo BES S.A.
CONSTRUCTION AREA: 2,000 m2
DEADLINE AND YEAR OF EXECUTION: 1 month (1993)
LOCATION: Alajuela